ZED collective is a residential building complex located in Yelankha municipality of Banglaore in hot and humid climatic zone. Total built up area of the project is 60,273m2, with a total of 132 dwelling units. The project incorporates several energy saving, water saving measures and use of energy efficient material in construction.
Overall performance
Energy performance index (EPI) of the project is 39kWh/m2/year. The overall performance of the project is affected by the use of energy efficient mechanical systems, with incorporation of low energy materials used during the construction.
Cost and effectiveness
The overall cost of the project accounts to 4,991,000 Euro, out of which cost of building envelope is 4,025,000 Euro and cost of technical installation is 966,000 Euros.
Actors
Developer
Biodiversity Conservation India ltd.
Architect
Space matrix Design consultants
Building basics
Year of completion |
2008 |
Number of units |
132 |
Number of occupants |
None people |
Elevation |
None m |
Building areas
The residential complex consist of different types of dwelling units such as 3 BHK, 2 BHK and 1 BHK. Each apartment comprise of a kitchen, bedrooms, living space, balcony etc.
Special features
Additional Sustainable site features includes
- Heat reflective coating has been done on the exposed roof areas to reduce the urban heat island effect.
- 100% rain water harvesting is done at the site rooftop collection, storage and reuse on site.
- A provision for electric charging of 2 and 4 wheelers is provided at the site.
The external walls of the building are constructed with hollow block which have higher thermal resistance as compared to the conventional brick wall. The heat reflective thermal coating has been done on the exposed roof of the building to minimize the heat gains from roof. The windows comprise of single glass.
Type of construction |
Middle |
Ground floor
U-value |
3.060 W/m2K |
Total thickness |
20.00 cm |
Total area |
m2 |
Material |
Thickness |
Thermal conductivity λ |
RCC Slab |
15.00 cm |
None W/mK |
Cement Mortar |
4.00 cm |
None W/mK |
Ceramic Tile |
1.00 cm |
None W/mK |
(From outside to inside)
Basement walls
U-value |
None W/m2K |
Total thickness |
43.00 cm |
Total area |
m2 |
Material |
Thickness |
Thermal conductivity λ |
Hollow Block Wall |
20.00 cm |
None W/mK |
Concrete retaining Wall |
23.00 cm |
None W/mK |
(From outside to inside)
External walls
U-value |
0.700 W/m2K |
Total thickness |
22.00 cm |
Total area |
m2 |
Material |
Thickness |
Thermal conductivity λ |
Cement Plaster |
1.00 cm |
None W/mK |
Hollow Block Wall |
20.00 cm |
None W/mK |
Cement Plaster |
1.00 cm |
None W/mK |
(From outside to inside)
Windows
U-value window |
None W/m2K |
Total area |
1776 m2 |
Glass infill |
|
Coating/Tint |
|
Solar heat gain coefficient |
0.85 |
U-value glass |
None W/m2K |
U-value window frame |
None W/m2K |
Passive strategies
The earth air tunnel cooling system is installed in the residential complex, for cooling applications of the dwelling units. The earth air tunnel cooling system is a low energy cooling system.
Energy efficient electromechanical systems have been installed in the residential complex. There is no heating requirement in the projects. For cooling purpose Earth air tunnel has been installed along with energy efficient air conditioning units.
Indoor design temperature summer |
28 °C |
Indoor design temperature winter |
22 °C |
Heating system
No heating requirement in the project.
Cooling system
The cool air supply from the Earth air tunnel is being fed in the apartments, along with individual air conditioning units of COP 3.5 have been installed in the apartments.
Hot water system
A centralized evacuated tube type solar water heating system along with individual electric geysers in each apartment has been installed.
Power generation
There is no additional source of power generation in the complex. The entire electrical supply depends on the grid.
Detailed information on installed power generators not known.
Energy efficient lighting and appliances
The energy efficient lighting system has been installed in the residential complex. For outdoor applications LED fixtures and for indoor CFL has been used.
The energy consumption of the building has estimated based on the simulation results. The energy simulation has been carried out in IT Toolkit EnEff: ResBuild India. The annual electricity consumed in the building is 2,351,239 kWh.
Primary energy consumption |
2351239.00 kWh/year |
Primary energy consumption (ref. building) |
2351239.00 kWh/year |
Specific primary energy consumption |
39.00 kWh/m2/year |
Specific primary energy consumption (ref. building) |
102.00 kWh/m2/year |
Differentiated specific primary energy demand and production
Accumulated specific primary energy demand and production
The overall cost of the project accounts to 4,991,000 Euro, out of which cost of building envelope is 4,025,000 Euro and cost of technical installation is 966,000 Euros.
Envelope costs |
4025000 EUR |
Systems costs |
966000 EUR |
Total investment costs |
4991000 EUR |
Cost: |
82.80 EUR/m2 |
Yearly energy costs |
291500 EUR/year |
Investment cost
Absolute building investment costs
Specific building investment cost
Annual Costs
Absolute annual costs
Specific annual cost
Assumptions
Local Currency |
INR |
Currency rate to EUR |
0.01400 (May 2, 2017) |
Energy prices
Electricity |
0.1250 EUR/kWh |